and More

Mersin_TerralWind
2012/2013_Mersin Extension (Turkey)
April 10, 2016

and More


2021 – Klinksberg-Humberg (Germany)
Installation: 1 Vestas WTG_V117 3.45MW 141.5HH LDST
2020/2021 – Gaziosmanpaşa (Turkey)
Installation Supervision: 14+1 Vestas WTGs_V136 3.6MW 120HH – 1 Terral Wind Supervisor
2020 – Mutlu-5 (Turkey)
Installation Supervision_Site documentation: 11+2 Vestas WTGs_V136 3.45/3.6MW 82/108HH – 1 Terral Wind Supervisor
2020 – TPI Konya (Turkey)
Blade exchange: 20 SGRE WTGs_G132 3.3MW
2020 – Çandir (Turkey)
Installation: 1 GE WTG_3.8-130 3.8MW 110HH
2020 – Gazi-9 (Turkey)
Installation: 14 GE WTGs_Cypress 5.3-158 5.3MW 120.9HH
2020 – Högaliden (Sweden)
Installation: 25 Vestas WTGs_V150 4.2MW 125HH
2020 – Häger (Germany)
Installation Supervision_LDST Pre-assembly: 1 Vestas WTGs_V126 3.45MW 137HH – 1 Terral Wind Supervisor
2019 – Tres Mesas IV (Mexico)
Installation Supervision: 24 Vestas WTGs_V150 4.0MW 105HH – 1 Terral Wind Supervisor
2019 – Several Wind Parks (Germany)
Tower bolt re-torque: Vestas WTGs – 1 Terral Wind Team
2019 – Lakiakangas II (Finland)
Installation: 12 Vestas WTG_V150 4.2MW 135HH
2019 – Streumen V (Germany)
LDST pre-assembly: 1 Vestas WTG_V126 3.45MW 137HH
2019 – Åskälen (Sweden)
Pre-installation: 80 Vestas WTG_V136 3.6MW 112HH
2019 – Fjällberget (Sweden)
Installation: 3 Vestas WTG_V136 3.6MW 105HH
2019 – Sötterfällan (Sweden)
Installation: 10 Vestas WTG_V136 3.6MW 105HH
2019 – ESPF (Denmark)
Tower sections & Nacelle pre-assembly: Vestas WTGs_V164 8.0MW
2019 – Cobadin (Romania)
Blade dismounting & remounting: Vestas WTG_V90 2.0MW
2019 – Mesa la Paz (Mexico)
Installation Supervision: 85 Vestas WTGs_V136 3.45/3.6MW 120HH – 2 Terral Wind Supervisors
2019 – Vicente Guerrero (Mexico)
Installation Supervision: 33 Vestas WTGs_V136 3.45/3.6MW 112HH & 120HH – 1 Terral Wind Supervisor
2018 – Reynosa (Mexico)
Completion & Remedy of punch list items: Vestas WTGs_V136 3.45MW 120HH
2018 – Icor (Tenerife-Spain)
Installation: 6 Gamesa WTGs_G132 3.465MW 84HH
2018 – Piedra Larga I (Mexico)
Pre-installation: Gamesa WTGs_G80 2.0MW 67HH
2018 – Salitrillos (Mexico)
Installation Supervision: 30 Vestas WTGs_V136 3.45MW 120HH – 3 Terral Wind Supervisors
2018 – Reynosa (Mexico)
Internal works & Completion: Vestas WTGs_V136 3.45MW 120HH
2018 – Reynosa (Mexico)
Installation Supervision: 123 Vestas WTGs_V136 3.45MW 120HH – 2 Terral Wind Supervisors
2018 – ESPF (Denmark)
Tower sections pre-assembly: Vestas WTGs_V164 8.0MW
2018 – Tres Mesas III (Mexico)
Installation Supervision: 15 Vestas WTGs_V136 3.45MW 120HH – 1 Terral Wind Supervisor
2018 – Merkur (Holland)
Tower sections pre-assembly: GE WTGs_Haliade 150 6.0MW
2017 – Tungerloh-Pröbsting (Germany)
Installation: 1 Vestas WTG_V126 3.3MW 117HH
2017 – Essel (Germany)
Pre-installation: 2 Vestas WTGs_V112 3.45MW 140HH
2017 – Albesti & Vutcani (Romania)
4 Years Maintenance: 14 + 12 Vestas WTGs_V90 2.0MW
2017 – Corni (Romania)
4 Years Maintenance: 35 Vestas WTGs_V90 2.0MW
2016 – Reuβenköge Repowering IIIa (Germany)
Pre-installation: 3 Vestas WTGs_V112 3.45MW 94HH
2016 – Rethwisch I & II (Germany)
Installation: 2 Vestas WTGs_V112 3.3MW 140HH
2016 – Auras Süd (Germany)
Installation: 1 Vestas WTG_V126 3.3MW 137HH LDST tower
2016 – Kavarna (Bulgaria)
Blade bearing replacement: Vestas WTG_V90 2.0MW
2015/2016 – Miltzow (Germany)
Installation: 1 Vestas WTG_V112 3.0MW 119HH
2015/2016 – Mannhagen III (Germany)
Installation: 2 Vestas WTGs_V112 3.3MW 140HH
2015 – Greuβen (Germany)
Installation: 2 Vestas WTGs_V112 3.0MW 140HH
2015 – Altentreptow (Germany)
Installation: 1 Vestas WTG_V112 3.3MW 140HH
2015 – Reuβenköge Repowering IA (Germany)
Installation: 3 Vestas WTGs_V112 3.3MW 94HH
2015 – Kangal Extension (Turkey)
Transformer Door Mechanical Lock Installation: 17 Vestas WTGs_V110 2.0MW
2015 – Mihai Viteazu (Romania)
Punch List Maintenance: 10 Gamesa WTGs_G87 2.0MW
2015 – Salbatica I (Romania)
Retrofit_LTK Installation: 35 Gamesa WTGs_G90 2.0MW
2015 – Salbatica II (Romania)
Retrofit_LTK Installation: 35 Gamesa WTGs_G90 2.0MW
2015 – Vranino (Bulgaria)
Gearbox Oil Change: 9 Gamesa WTGs_G90 2.0MW
2015 – Cudalbi (Romania)
Gearbox Oil Change: 5 Gamesa WTGs_G90 2.0MW
2015 – Suvorovo (Bulgaria)
Gearbox Oil Change: 30 Gamesa WTGs_G90 2.0MW
2015 – Karapelit (Bulgaria)
Gearbox Oil Change: 6 Gamesa WTGs_G90 2.0MW
2015 – Corugea (Romania)
Blade dismounting & remounting: Vestas WTG_V90 2.0MW
2015 – Dorobantu (Romania)
Blade dismounting & remounting: Vestas WTG_V90 3.0MW
2015 – Cernavoda 2 (Romania)
Blade dismounting & remounting: Vestas WTG_V90 3.0MW
2014 – Reuβenköge III (Germany)
Installation: 1 Vestas WTG_V112 3.3MW 94HH
2014 – Hellschen Heringsand Unterschaar (Germany)
Installation: 1 Vestas WTG_V112 3.3MW 119HH
2014 – Garlipp IV (Germany)
Installation: 1 Vestas WTG_V112 3.0MW 94HH
2014 – Mihai Viteazu (Romania)
Punch List Maintenance: 40 Gamesa WTGs_G87 2.0MW
2014 – Pantelimon (Romania)
1 Year Maintenance: 11 Vestas WTGs_V90 3.0MW
2014 – Facaeni (Romania)
3 Months Maintenance & Other: 44 Vestas WTGs_V112 3.0MW
2014 – Cernavoda 1 (Romania)
Blade dismounting & remounting: Vestas WTG_V90 3.0MW
2013 – Rastenberg (Germany)
Installation: 2 Vestas WTGs_V90 2.0MW 125HH
2013 – Somova (Romania)
Installation: 1 Vestas WTG_V90 2.0MW 105HH
2013 – Pogoanele (Romania)
Installation: 4 Vestas WTGs_V90 2.0MW 105HH
2013 – Casimcea (Romania)
Blade dismounting & remounting: Vestas WTG_V90 2.0MW
2013 – Slobozia Conachi (Romania)
Installation: 1 Vestas WTG_V90 2.0MW 95HH
2013 – Valle de Los Vientos (Chile)
Transformer Door Mechanical Lock Installation: 45 Vestas WTGs_V100 2.0MW
2012 – Hat (Czech Republic)
Installation: 1 Vestas WTG_V100 1.8MW 95HH
2012 – Cerro San Anton (Spain)
Transformer Door Mechanical Lock Installation: 4 Vestas WTGs_V100 2.0MW
2012 – Cerro San Anton (Spain)
Installation: 4 Vestas WTGs_V100 2.0MW 80HH
2012 – Bystra (Poland)
Retrofit_ALCL Filter Capacitor: 12 Gamesa WTGs_G90 2.0MW
2012 – Bystra (Poland)
Retrofit_KA2 Relay: 12 Gamesa WTGs_G90 2.0MW
2012 – Bystra (Poland)
Retrofit_FG008: 12 Gamesa WTGs_G90 2.0MW
2012 – Mihai Viteazu (Romania)
Retrofit_FG008: 40 Gamesa WTGs_G87 2.0MW
2012 – Mihai Viteazu (Romania)
Retrofit_Sealing of Hub-Blade: 40 Gamesa WTGss_G87 2.0MW
2012 – Mihai Viteazu (Romania)
Retrofit_Pitch Cylinder: 40 Gamesa WTGs_G87 2.0MW
2012 – Mihai Viteazu (Romania)
Retrofit_Hoist Bag Support: 40 Gamesa WTGs_G87 2.0MW
2012 – Salbatica II (Romania)
Retrofit_Transformer Braces: 2 Gamesa WTGs_G90 2.0MW
2012 – Salbatica I & II (Romania)
Retrofit_Hoist Bag Support: 35 Gamesa WTGs_G90 2.0MW
2012 – Karapelit (Bulgaria)
Retrofit_Pitch Cylinders: 6 Gamesa WTGs_G90 2.0MW
2012 – Suvorovo (Bulgaria)
Retrofit_Hoist Bag Support: 30 Gamesa WTGs_G90 2.0MW
2012 – Szadek (Poland)
Retrofit_Shackles & Pendulum: 2 Gamesa WTGs_G90 2.0MW
2012 – Golice (Poland)
Retrofit_Hoist Bag Support: 19 Gamesa WTGs_G90 2.0MW
2012 – Dealul Pietros (Romania)
Major Repair_30kV 3 Phase Underground Cable
2011 – Salbatica I & II (Romania)
Retrofit_Pitch Cylinders: 35 Gamesa WTGs_G90 2.0MW
2011 – Salbatica II (Romania)
Retrofit_Gearbox Pump: 4 Gamesa WTGs_G90 2.0MW
2011 – Salbatica I (Romania)
Retrofit_Shackles & Pendulum: 6 Gamesa WTGs_G90 2.0MW
Pagini web Bacau